Alkhalifa Construction Built Strong. Built to Last.
We construct durable, high-performance buildings using proven engineering, skilled execution, and uncompromising standards.

Our purpose
Build with Quality
We are committed to delivering high-quality construction by using reliable materials, proven methods, and skilled workmanship to ensure strong and durable structures.
Work with Integrity
We conduct our work with honesty, transparency, and responsibility, maintaining clear communication and ethical standards at every stage of a project.
Create Lasting Value
We aim to build structures that provide long-term value, functionality, and safety for communities, businesses, and future generations.
ABOUT US
PROJECTS

Humon side-blowing smelting system
The first production line in China of gold recovery from Cu matte with co-treatment of cyanide tailings
Capacity of 400kt/a mixed concentrate, output of 100kt/a cathode copper Production started in 2018

Fangchenggang Copper Smelter
The world's largest single-train double-flash production line Annual design throughput of 1.65Mt copper concentrate; annual output of 400Kt cathode copper; startup in 2013 and reaching full production in the same year. The output of cathode copper has been stabilized above 470Kt since the transformation in 2018.
Its flash converter and anode furnace both lasted for 5 years at the first campaign, the best performance in the industry.

The Baltic Copper & Sulfuric Acid Complex
The Baltic Copper & Sulfuric Acid Complex is a modern industrial facility designed for the production of high-purity sulfuric acid as a by-product of copper processing. The plant is engineered and operated in full compliance with European Union environmental, safety, and industrial standards.
The facility plays a critical role in supporting metallurgical operations by converting sulfur-rich off-gases into commercially valuable sulfuric acid, while significantly reducing atmospheric emissions.

Danube Integrated Steel Works

Silverpeak Gold Concentrator Plant
The Silverpeak Gold Concentrator Plant is a privately developed industrial facility designed and constructed to process gold-bearing ore. The plant was built in a remote industrial zone in Central Europe, selected for its infrastructure access and regulatory stability.
The facility operates year-round and represents a modern European approach to mineral processing, combining durability, efficiency, and environmental control. The project was completed as an independent development and is fully self-contained.

NordAurum Gold Processing Complex
The NordAurum Gold Processing Complex is a large-scale gold mining and processing facility developed and constructed as a standalone industrial project in Central Europe.
The complex was built in a remote, low-density industrial area to allow uninterrupted operations and future expansion. The location was selected for its stable terrain, access to transport routes, and availability of utilities required for continuous mineral processing.
The facility integrates ore handling, crushing, conveying, and processing systems within a unified structural layout. Elevated conveyor networks connect multiple processing sections, allowing efficient material flow across the site.